BID NOTICE ABSTRACT 2021

Supply of Liquid/Gas Chlorine for first Quarter
Bacteriological and HPC Test for 2021

BID NOTICE ABSTRACT & INVITATION FOR BIDS 2020

Physical Chemical Analysis 2020
Supply of Liquid/Gas Chlorine - 4th Quarter 2020
Brass Fittings - 4th Quarter 2020
Physical Chemical Analysis 2020
For Meter Reading and Billing Section
ICT Equipment and Devices and Accessories
Additional Pipe Laying in Parulan NIA Road (Mosque)
Physical Chemical Analysis
Spare 100mm Flowmeter
Data Logger
NLC Fittings - 3rd Quarter 2020
NLC Fittings - 2nd Quarter 2020
Part of Additional Blow-off Project (Materials)
Part of Additional Blow-off Project (Materials)
NLC Fittings - 4th Quarter 2020 
Water Meter - 4th Quarter 2020
G.I. Fittings - 4th Quarter 2020
Polyethylene Tubing - 4th Quarter 2020
Brass Fittings and Hacksaw Blade - 4th Quarter 2020
C.I. Fittings - 4th Quarter 2020
Part of Chlorine Test Kit - 4th Qtr. 2020
Part of Additional Blow-Off Project (Materials)
Reconditioning of Pumps (Labor)
Reconditioning of Pumps (Materials)
Chlorine Test Kit - 4th Quarter 2020
Spare Booster Pump
Additional Pipe Laying in Parulan NIA Road (Mosque)
ISO Consultancy Services
Annual Physical Exam (APE) 2020

 


     


  ANNUAL PHYSICAL EXAM (APE) 2020

 


  BIDDING DOCUMENT FOR DESIGN AND CONSTRUCTION OF PLARIDEL WATER SUPPLY SYSTEM
 Document 1, Document 2, Document 3
*click the link to download the file 

 


 NOTICE OF ANNULMENT


 BIDDING DOCUMENT FOR PROCUREMENT OF SECURITY SERVICES
Document 1
*click the link to download the file
 



 BIDDING DOCUMENT FOR VILLA GLORIA PIPE LAYING PROJECT (LABOR & MATERIAL COST)
 Document 1 & Document 2
*click the link to download the file

 


 BIDDING DOCUMENT FOR BINTOG NIA ROAD PIPE LAYING PROJECT (LABOR & MATERIALS)
 Document 1 & Document 2
*click the link to download the file

 


 

BIDDING DOCUMENT FOR DESIGN AND CONSTRUCTION OF PLARIDEL WATER SUPPLY SYSTEM
 Document 1, Document 2, Document 3, Document 4 & Document 5
*click the link to download the file 

 


 Supply and Delivery of Brass Fittings - 3rd Quarter 2020
Supply and Delivery of Polyethylene Tubing - 3rd Quarter 2020
Supply and Delivery of G.I. Fittings - 3rd Quarter 2020
Supply and Delivery of Water Meter 1/2" - 3rd Quarter 2020
Supply and Delivery of C.I. Fittings - 3rd Quarter 2020
Supply and Delivery of NLC Fittings - 3rd Quarter 2020
Supply and Delivery of Printing of Official Receipt
Supply and Delivery of Shackle Lock
Computer Desktop
Repairs and Maintenance for CCTV - 2nd Quarter 2020
Part of Plumbing Tools for 1st Qtr
Cross Pipe Relocation Project in NIA CANAL (Materials) for 1st Qtr
Temporary Relocation of Steel Pipe in Agnaya (Materials)
Cement, Sand and Gravel - 1st Quarter 2020
Supply and Delivery of Water Meter 1/2" - 2nd Quarter
Supply and Delivery of Flow Meter - 2nd Quarter 2020
Supply and Delivery of G.I. Fittings - 2nd Quarter 2020
Supply and Delivery of Polyethylene Tubing - 2nd Quarter 2020
Supply and Delivery of Brass Fittings - 2nd Quarter 2020
Supply and Delivery of C.I. Fittings - 2nd Quarter 2020
Materials for Reconditioning of Pump
 Reconditioning of Pump in Culianin Pump Station
Supply and Delivery of Liquid/Gas Chlorine for 2nd Quarter
Supply and Delivery of Thermal Paper
Supply and Delivery of Reagent for Chlorine Residual Testing (1200 test/pack)
  Supply and Delivery of Liquid/Gas Chlorine for 1st Qtr
Flow Meter - 1st Quarter 2020
Office Supplies and Materials 1st Quarter
Supply and Delivery of C.I. Fittings
Supply and Delivery of Flow Meter
Supply and Delivery of PE
Supply and Delivery of G.I. Fittings for 1st Qtr
Supply and Delivery of Teflon Tape for 1st Qtr
Supply and Delivery of Maintenance and Construction Tools - 1st Quarter
 Supply and Delivery of Jack Hammer
Supply and Delivery of Lightning Equipments
Supply and Delivery of Maintenance and Construction Tools - 1st Quarter
Supply and Delivery of For Meter Reading and Billing Section
 Supply and Delivery of G.I. Fittings, Teflon Tape, Hacksaw Blade and Rubber Washer - 1st Quarter 2020
Supply and Delivery Water Meter - 1st Quarter 2020
Supply and Delivery of Polyethylene and PVC Tubing - 1st Quarter 2020
Supply and Delivery of Brass Fittings - 1st Quarter 2020
Supply and Delivery of C.I. Fittings, Valve Box Cover and Flow Meter - 1st Qtr. 2020
Supply and Delivery of NLC Fittings - 1st Quarter 2020
Supply and Delivery of Construction Materials AF
For Personal Protective Equipment (P.P.E) - 1st Quarter
Supply and Delivery of Construction Materials for Cross Pipe Relocation Project in NIA CANAL 1st Qtr.
Supply and Delivery of PE for Cross Pipe Relocation Project in NIA CANAL
Supply and Delivery of C.I. elbow w/stc for TEMPORARY RELOCATION OF STEEL PIPE IN AGNAYA
Supply and Delivery of materials for TEMPORARY RELOCATION OF STEEL PIPE IN AGNAYA
Supply and Delivery of PVC Pipe 6" x 6 meter w/ hub for TEMPORARY RELOCATION OF STEEL PIPE IN AGNAYA
Supply and Delivery of UPVC pipe for ALVEO INTERCONNECTION PROJECT
Bacteriological and HPC Test for 2019

BID NOTICE ABSTRACT 2019

Supply and Delivery of G.I. and C.I. Fittings
Supply and Delivery of Grocery Giveaways
Supply and Delivery of Water Meter 1/2 4th Qtr.
Supply and Delivery of Multi Function Brass Ball Valve with Lockwing 3/4
Supply and Delivery of Disconnection Lock and Seal 4th Qtr.
Supply and Delivery of Brass Fittings / Check Valve
Supply and Delivery of Air-conditioning Unit
Disconnection Lock and Seal
Supply and Delivery of Genset Roofing
Supply and Delivery of Personal Protective Equipment (PPE)
Roofing of Genset at Lalangan Pump Station - Materials
Temporary Relocation of Mainline in Agnaya Bridge - Pipes
Temporary Relocation of Mainline in Agnaya Bridge - Fittings
Supply and Delivery of Brass Fittings and Rubber Washer for Materials for New Connection and Maintenance 4th Qtr. 2019
Supply and Delivery of Water Meter and Meter Protector for New Connections and Maintenance 4th Qtr. 2019
Procurement of Security Services 2019 Part 1 Part 2 Part 3 Part 4 Part 5 Part 6 Part 7 Part 8
PLAWD Genset Roofing Lalangan Pump Station
Supply and Delivery of NLC Fittings for Materials for New Connection and Maintenance 3rd Qtr. 2019
Supply and Delivery of Full-Face Gas Mask / Respirator
Reagent for Chlorine Residual Testing (1200test/pack)
OR for Commercial Division
Physical-Chemical Analysis
Flow Meter Calibration
Supply and Delivery of Polyethylene Tubing for Materials for New Connection and Maintenance 3rd Qtr. 2019
Supply and Delivery of NLC Fittings
Supply and Delivery of G.I., C.I., and Brass Fittings for Materials for New Connection and Maintenance 3rd Qtr. 2019
Supply and Delivery of Liquid/Gas Chlorine
Supply and Delivery of Full-Face Gas Mask / Respirator
Supply and Installation of Generator Set for Plaridel Heights Pump Station